Skip to content
Pro lab · Change management · OT / ICS

OT Change Management Lab

In operational technology, a change that looks small can stop a freezer. Here you decide how much process each of three real-world-style OT changes deserves: a PLC logic update, a vendor remote-access path into Purdue Level 3, and a vendor-signed historian patch.

For each one you classify the change, rate its risk, pick the approvers, plan the test, rollback, window, communications and verification, and then a seeded outcome shows whether your plan held. Penalties apply for the classic mistakes. Debrief exports a change record per change and a CSV register.

Free to try with a free account (3 Pro tool runs in total), then Pro
0s
Seed …

You are the change manager at Northmere Cold Chain

Northmere Cold Chain (northmere.example) is a fictional chilled-food distributor with three refrigerated hubs. Each hub runs compressor racks on PLCs, a site operations network at Purdue Level 3, and a holiday dispatch freeze from Mon 14 Dec to Sun 3 Jan. You are the change manager. Three requests are on your desk today, and each needs a different weight of process.

  1. 1Classify it: standard, normal or emergency
  2. 2Rate the risk: impact, likelihood, blast radius, reversibility
  3. 3Pick the approvers and the CAB path
  4. 4Choose the test and validation plan
  5. 5Choose a rollback plan
  6. 6Pick the change window
  7. 7Choose communications and post-change verification
  8. 8See what happened, from a seeded outcome

3 changes. Pro hides the hints. A good test plan uncovers hidden dependencies as you choose it. Passing score is 70%.

Same seed and level = same option order and same outcomes for the same plan.

Loading…

TL;DR

What this lab is

5 points
  • An OT change management lab: you are the change manager at a fictional chilled-food distributor and you review three changes, a PLC logic update, a vendor remote-access firewall rule into Purdue Level 3, and a vendor-signed historian patch.
  • For each change you classify it (standard, normal or emergency), rate impact, likelihood, blast radius and reversibility, pick approvers, a test plan, a rollback plan, a change window, communications and a post-change verification.
  • A seeded outcome then resolves hidden dependencies and failures (rollback needed, drift, a missed dependency, an out-of-hours failure) and shows whether your plan held. Runs are repeatable with a ?seed= link.
  • Penalties apply for classic mistakes: emergency used to skip testing, no rollback, an untested rollback, a change inside a freeze, a single approver for a large blast radius, and no verification.
  • The debrief exports a Markdown change record (RFC) per change and a CSV change register. Downloading documents is Pro; reading them on the page is not.

Frequently asked questions

What is the OT Change Management Lab?

A browser-based training lab where you act as the change manager for a fictional chilled-food distributor. Over three OT changes you classify the change, assess risk, choose approvers, plan testing, rollback, the window, communications and verification, and then see a seeded outcome of what happened. It trains judgement about process weight, not tool syntax.

Why is change management different in OT?

In operational technology a change can affect physical processes and product, many systems have long lifecycles and vendor-qualified versions, and some can only be reached on site. Testing often needs a copy of the controller or a staging mirror, rollback may need a known-good program and a person on site, and maintenance windows are tied to production and freeze calendars. The lab builds those habits.

What is the difference between a standard, normal and emergency change?

In ITIL change enablement terms, a standard change is pre-authorised, low risk and follows a documented procedure, so it does not need case-by-case approval. A normal change is assessed and authorised by the right approvers or a change advisory board before it is scheduled. An emergency change is needed urgently to stop active or imminent harm, and is approved by a faster path, then reviewed afterwards. Urgency from a requester alone does not make a change an emergency.

Why does the vendor remote-access change need so many approvers?

It opens a new conduit into a Level 3 zone that reaches every site's control networks. In IEC 62443 terms a conduit between zones should be designed and reviewed. The architect owns the design, operations owns what the vendor can touch, and information security owns third-party access policy. A single approver for a change with a large blast radius is one of the penalised mistakes.

What makes a rollback plan good?

A good rollback is a known-good state that has been tried, with a stated time to restore and a way to run the process by hand in the meantime. In the PLC change that means a fresh, checksummed program export that has been reloaded on a spare CPU. An uninstall that has never been run, or a file on one laptop, is a hope, not a rollback.

How does the seeded outcome work?

Each change hides a few risks, such as a reused tag, a rule that is wider than needed or a downstream job that breaks. The seed fixes the dice. Choosing tests, rollback, windows and approvers that address a risk makes it much less likely to fire, and a good rollback or verification limits the damage if it does. The same seed, level and plan always give the same outcome.

How do the difficulty levels differ?

Rookie shows a hint at each step and a "watch for" list of hidden dependencies, and has the lowest chance that an unmitigated risk fires. Pro hides the hints, but a good test plan reveals a hidden dependency as you choose it. Elite hides everything until the outcome and raises the chance that an unmitigated risk fires.

What do I get in the export?

A Markdown change record per change, with type, risk, approvers, window, test, rollback, communications, verification, the simulated outcome and the process findings, and a CSV register of all three. Downloading and copying documents is Pro. You can read the same records on the debrief page.

Which frameworks does it reflect?

The terms follow ITIL change enablement. The controls echo NIST SP 800-53 configuration management (CM-3 configuration change control, CM-4 impact analyses, CM-5 access restrictions for change), ISO/IEC 27001 Annex A 8.32 change management, and IEC 62443 for zones and conduits. The lab is a training exercise, not a compliance checklist.

Is any of this real?

No. Northmere Cold Chain, its people, systems and the northmere.example domain are invented, any IP range is from the RFC 5737 documentation space, and every outcome is simulated in your browser. Nothing here connects to a real controller or network.

The tools people use most on PlayCISO.

All tools
🖤 Black Friday: new customers get 3 months of Pro for $5, then $5/month. Ends 30 Nov. Claim 3 months for $5 →