Skip to content
All tabletop exercises
OT / ICS·Advanced·Executive audience

Shut the plant or keep running? Costing an OT security decision

The prompt — read this to the room

Your food-packaging plant runs three shifts and produces about $95,000 of product an hour. At 10:00 the SOC confirms ransomware on the corporate network and finds the same malware on one engineering workstation that can reach the lines' controllers. The lines are running normally. Isolating the plant network means losing the production schedule and batch records held in IT systems and running on paper at reduced output. A full shutdown is safest and costs more every hour. A major customer's promotion depends on next week's shipments. The board chair wants options and numbers by 13:00.

Total duration
2 h 15 min
People to involve
7
Best fit
Manufacturing

Who to involve

Most important first.

  • CEO / Managing director
  • CFO / Finance
  • OT / plant engineer
  • CISO / Head of security
  • CIO / CTO
  • Legal counsel
  • Board member

What it tests

  • Build three costed options (run isolated, reduced output, full shutdown) with safety and food-quality conditions
  • Define the evidence that would trigger a move from one option to another
  • Bring insurance, customer contracts and food-safety record duties into the decision
  • Present a board-ready recommendation with explicit risk acceptance

Outline of activities

  1. 1Ransomware in IT, one foot in OT
  2. 2What the plant can actually do on its own
  3. 3Costing the three options
  4. 4Triggers, insurance and contracts
  5. 5Board briefing and recommendation

Free preview from the run sheet

First inject · minute 20

Engineering workstation

OT engineer: "The infected workstation has the PLC programming software and saved project files. It was last used to change a recipe on Line 2 on Friday."

Questions for the CEO / Managing director

  • What is your recommendation, and what risk does it accept?
  • What triggers would change your recommendation?
  • How do you communicate with the major customer?
  • Who has authority to restart the plant after shutdown?

Built on: NIST SP 800-82 Rev. 3, Guide to Operational Technology (OT) Security; ISA/IEC 62443-3-2, Security risk assessment for system design; NIST CSF 2.0; SEC Form 8-K Item 1.05 (disclose material cybersecurity incidents within four business days after determining materiality); FDA 21 CFR Part 117 (food safety records), where applicable.

The full run sheet below has every timed inject, the facilitator guide and questions for each role.

Run sheet

The facilitator's timeline of execution, the detailed steps for running the session and the questions to ask each person.

Loading…

More ot / ics exercises