Ransomware jumps from the office network to the plant floor

The prompt — read this to the room

It is 05:40 on a Monday at a 900-person auto-parts manufacturer running three shifts. Office laptops started showing ransom notes an hour ago. Now the night-shift supervisor reports that two HMI screens on the stamping line show the same note, and the historian server has stopped updating. The PLCs are still running and the presses are still making parts, but operators can no longer see process values on screen. The first shift arrives in 80 minutes. Do you keep the line running blind, shut it down, or cut the plant off from the corporate network first?

Total duration
2 h 30 min
People to involve
7
Best fit
Manufacturing

Who to involve

Most important first.

  • OT / plant engineer
  • CISO / Head of security
  • Incident response lead
  • IT operations
  • CEO / Managing director
  • Legal counsel
  • Communications / PR

What it tests

  • Decide whether and how to sever IT/OT connectivity, and show who holds the authority to do it.
  • Establish whether the line can run safely without HMI visibility, and the conditions that force a stop.
  • Agree a recovery order for IT and OT systems that does not reinfect restored plant assets.
  • Produce customer, staff and media statements that match what is actually known.

Outline of activities

  1. 1Night-shift report: ransom notes on HMIs and a silent historian
  2. 2The isolation call: who can cut the IT/OT link, and how fast
  3. 3Running blind: safety limits, manual operation and the shift change
  4. 4Scoping: how the malware crossed and which plant assets it touched
  5. 5Recovery order, customer deliveries and outside pressure
  6. 6Debrief against the decision log

Free preview from the run sheet

First inject · minute 10

Operator radio log

05:52 Line 2 operator: 'HMI-2 and HMI-3 are frozen on a red screen asking for payment. Presses still cycling. I can't see die temperatures or tonnage. Do I stop?'

Questions for the OT / plant engineer

  • Can the stamping presses run safely without HMI visibility, and for how long? What would make you stop them immediately?
  • If the IT/OT link is cut, which plant functions break (recipes, quality data, label printing, maintenance tools)?
  • Where are the current PLC project files and firmware versions for every controller on the line, and when were they last verified?
  • How would you prove a PLC's logic has not been altered before you trust it again?

Built on: NIST SP 800-82r3 Guide to Operational Technology (OT) Security; ISA/IEC 62443 series (zones and conduits); NIST SP 800-61r3 Incident Response Recommendations and Considerations for Cybersecurity Risk Management; CISA #StopRansomware Guide; MITRE ATT&CK for ICS; SEC Form 8-K Item 1.05 (material cybersecurity incidents, four business days after materiality determination).

The full run sheet below has every timed inject, the facilitator guide and questions for each role.

Run sheet

The facilitator's timeline of execution, the detailed steps for running the session and the questions to ask each person.