The safety system trips while you are hunting an intruder in the plant

The prompt — read this to the room

You are on day two of investigating suspicious traffic inside the control network of a chemical blending plant. Responders have a laptop on the OT switch capturing packets. At 14:20 the safety instrumented system trips reactor R-3 on high pressure, venting to the flare and closing the feed valves. The control room saw the pressure transmitter spike, but two field gauges read normal throughout. Operators want to reset the safety system and restart the batch, which is worth $400,000. The responders want the safety controller left untouched until they know whether anyone has reached it. Who decides?

Total duration
2 h 30 min
People to involve
5
Best fit
Manufacturing, Chemicals

Who to involve

Most important first.

  • OT / plant engineer
  • Incident response lead
  • CISO / Head of security
  • SOC analyst
  • IT operations

What it tests

  • Agree a decision rule for a safety-system trip during a live security investigation.
  • Distinguish a genuine process upset, an instrument fault and a manipulated signal using available evidence.
  • Decide when, and on what evidence, the safety controller can be trusted again.
  • Show that responders’ own tools on the OT network are controlled and cannot cause harm.

Outline of activities

  1. 1Day-two context: what the hunt has found so far
  2. 2The trip: real upset, faulty transmitter or manipulated signal?
  3. 3Restart pressure versus preserving the safety controller
  4. 4Proving the safety system is trustworthy before restart
  5. 5Rules of engagement for responders working on OT networks

Free preview from the run sheet

First inject · minute 20

Process data at the trip

PT-301 (SIS transmitter): 14:19:52 8.2 bar, 14:20:01 17.9 bar, trip at 16.0. BPCS transmitter PT-300 on the same vessel: 8.3 bar steady. Field gauges PG-301 and PG-302: 8 bar throughout, read by operator at 14:24.

Questions for the OT / plant engineer

  • Is the plant in a safe state right now, and what confirms it?
  • What do the transmitter disagreements tell you, and how would you test PT-301 without touching the SIS logic?
  • What does the site procedure require before an SIS reset and restart after an unexplained trip?
  • How do you verify the SIS logic matches the last approved configuration?

Built on: IEC 61511 Functional safety: safety instrumented systems for the process industry sector; NIST SP 800-82r3 Guide to Operational Technology (OT) Security; ISA/IEC 62443-3-2 (security risk assessment and zones); MITRE ATT&CK for ICS (Inhibit Response Function tactic); NIST SP 800-61r3.

The full run sheet below has every timed inject, the facilitator guide and questions for each role.