You cannot protect every OT asset equally, so rank them. Add your assets by form or paste a CSV, and this scores each one on a transparent 0–100 risk model — criticality (safety and business consequence × Purdue level) against exposure (internet/remote reach, patchability, redundancy). You get a sortable table, a risk scatter that puts your crown-jewel, high-exposure assets in the top-right, and a prioritised remediation order. Nothing leaves your browser.

Add an asset

Portfolio

8
assets
49
avg risk
2
critical (≥70)
3
internet-facing

Model: Risk = Criticality × (0.4 + 0.6 × Exposure/100). Criticality blends safety 45%, business 30%, Purdue proximity 15%, redundancy 10%. Exposure blends network reach 50%, patchability 35%, asset surface 15%.

Risk scatter

Criticality (vertical) vs exposure (horizontal). Top-right = protect first.

Exposure →Criticality →PROTECT FIRST

Ranked assets

AssetTypePurdueCriticalityExposureRiskBand
Substation RTURTUL1898581Critical
Safety ESD logic solverSISL1966274Critical
Boiler PLCPLCL1815459High
Plant HMI (control room)HMIL2736558High
Engineering workstationEWSL3576645Medium
Vendor VPN applianceNetworkL3.5348731Medium
Flow transmitterField deviceL0404527Low
Data historian (DMZ)HistorianL3.5227819Low

Prioritised remediation order

1
Substation RTUCritical · 81

Remove from the public internet; terminate access in a DMZ; Virtually-patch and tighten network ACLs until a window opens; Add redundancy / tested manual fallback for this single point

2
Safety ESD logic solverCritical · 74

Isolate/segment and wrap with compensating controls (it cannot be patched); Strongly isolate from the control network; verify SIS independence

3
Boiler PLCHigh · 59

Virtually-patch and tighten network ACLs until a window opens; Add redundancy / tested manual fallback for this single point

4
Plant HMI (control room)High · 58

Broker remote access through a monitored jump host with MFA

5
Engineering workstationMedium · 45

Broker remote access through a monitored jump host with MFA

6
Vendor VPN applianceMedium · 31

Remove from the public internet; terminate access in a DMZ; Virtually-patch and tighten network ACLs until a window opens

7
Flow transmitterLow · 27

Isolate/segment and wrap with compensating controls (it cannot be patched)

8
Data historian (DMZ)Low · 19

Remove from the public internet; terminate access in a DMZ

Loading…

Sample report · illustrative data

Sample result: OT asset risk ranking

Example ranking of four invented plant assets, each described by type, Purdue level, safety consequence, network exposure, patchability, redundancy and business impact.

Ranked assets (criticality and exposure 0 to 100)

RankAssetLevelCriticalityExposureRiskBand
1Substation RTU (internet-facing, hard to patch, no redundancy)L1898581Critical
2Safety ESD logic solver (internal only, unpatchable)L1966274Critical
3Boiler PLC (internal only, hard to patch, no redundancy)L1815459High
4Flow transmitter (air-gapped, unpatchable, full redundancy)L0404527Low

Suggested remediation for the top asset

  • Remove it from the public internet; terminate access in a DMZ
  • Virtually patch and tighten network ACLs until a maintenance window opens
  • Add redundancy or a tested manual fallback for this single point of failure

How the scores combine

Criticality weighs safety consequence, business impact, Purdue level and redundancy. Exposure weighs network reach, patchability and the asset type. Risk equals criticality scaled up by exposure, so a catastrophic but air-gapped asset still ranks while an internet-facing crown jewel ranks highest. Bands: Critical from 70, High from 50, Medium from 30, otherwise Low.